Complex modernization water supply and sewerage systems of Lutsk

Lutsk city
Volyn Region
Water supply, wastewater
preparation

Estimated cost

10 900 000  EUR

Brief description:

The Project  consists of the several subprojects:

  • Rehabilitation of the water treatment plant (WTP) in city Lutsk;
  • Rehabilitation of the waste water treatment plant (WWTP);
  • Modernization of the existing Waste Water Pumping Stations (WWPS) #1, 2, 3, 5;
  • Rehabilitation of the water pipeline with L=7km, with replacing steel pipes with D=600 mm for plastic with D=450mm;
  • Replacing the old worn-out special vehicles with a new more efficient.

Beneficiary:

PUC “Lutskvodokanal”

Similar Projects

Technical rehabilitation of the water supply and water sewerage systems of Rivne oblast cities

The Project aimed at the reduction of negative environmental impact with improving services of water supply and wastewater transport and treatment. The Project consists of several subproject s that include such works as rehabilitation of worn-out pipe networks of pure water, rehabilitation of water pump stations, technical re-equipment of sewage pumping stations, construction...

Implementation of the Energy Efficiency in 33 buildings of education sector in Sumy

It is foreseen within the Project to improve energy efficiency of 33 kindergartens aiming to reduce energy resources usage and create comfort conditions for children and stuff. The following services will be provided: replacement of lighting system, installation of modern energy efficiency equipment, reconstruction of heat supply system, heat pump insulation, replacement of...

Integrated improvement of solid waste management in the city Lviv

The Project  purpose is to recultivate the existing landfills and establish a modern and efficient system of solid waste management including construction of the waste recycling facility. Implementation of the Project  will allow recycling up to 36% of waste, with a gradual increase in depth processing. The proposed Project  consists of 2 main components: Component 1...

Construction of new Deyiv Hora landfill facility and Improvement of solid waste management in the city Kremenchuk

The Project provides for the construction of solid waste sorting line with the annual capacity from 50 to 100 thousand tons. Waste recycling will include the following equipment: loading conveyor, sorting platform, sorting conveyor, separating drum, overload conveyor, reverse conveyor, belt that delivers valuable resource faction in automatic press, automatic press, storage...

Thermal modernization of the 90 public buildings (schools, kindergartens) of Ternopil

The Project involves thermal modernization of 52 schools (gross area 184553 m2) and 38 kindergartens (gross area 67653 m2). It includes the following measures: repair of external insulation, light systems, air ventilation and conditioning systems, and installation of modern equipment. The aim of the Project to improve comfort level, reduce energy consumption, save energy...