Complex thermal modernization of public buildings

Khmelnitsky city
Khmelnytskyi Region
Energy efficiency
preparation

Estimated cost

7 763 400 EUR

Brief description:

After analysing current state of public buildings energy consumption, it was proposed to implement the following measures:

  • Indoor lighting system modernization in order to ensure the normative level of lighting;
  • Thermal insulation and individual heating substation installation to ensure energy efficiency;
  • Window replacement and facade insulation.

Beneficiary:

Khmelnitsky city council

Similar Projects

Thermomodernization of the public buildings in Zaporizhzhia

Thermomodernisation of 14 buildings of public healthcare sector and 46 buildings of public education sector Activities include: insulation of exterior walls, replacement of windows and doors, insulation of roofs, insulation cap, insulation ceiling basement, restoration of drainage system, installation of local ventilation systems with heat recovery, reconstruction of the...

Optimization of the district heating systems in the city Oleksandriia

The Project  provides a total heat system reconstruction of Oleksandriya city central part (80% of a total city consumption) with moderate heat system decentralization and implementation of modern energy efficiency equipment. The heat system decentralization predicts heat energy source relocation closer to consumers, into exist heat substations, which located in the middle...

Technical rehabilitation of the water supply and water sewerage systems of Rivne oblast cities

The Project aimed at the reduction of negative environmental impact with improving services of water supply and wastewater transport and treatment. The Project consists of several subproject s that include such works as rehabilitation of worn-out pipe networks of pure water, rehabilitation of water pump stations, technical re-equipment of sewage pumping stations, construction...

Modernization of the district heating systems in the city Kamianske

The Project  is divided into 2 phases. 1st phase of the Project  includes: Construction of two boiler plants at the sites where the pumping station and the central heat distribution center is located. This will allow to refuse from the purchase of heat from the outside party JSC "Dneprodzerzhinsk HPP" Construction of two boiler plants on existing sites at the sites...

Thermomodernization of the public buildings in Chernigiv

The aim of the Project is to reduce energy consumption of public buildings, improve their technical condition, reduce the risk of accidents of installations operation, improve comfort level and introduce alternative sources of energy for satisfying the demand of hot water in public buildings. The relevance of the Project  for educational and healthcare facilities is caused...