Construction of new Deyiv Hora landfill facility and Improvement of solid waste management in the city Kremenchuk

Kremenchug city
Poltava Region
Solid waste
preparation

Estimated cost

12 000 000 EUR

Brief description:

The Project provides for the construction of solid waste sorting line with the annual capacity from 50 to 100 thousand tons. Waste recycling will include the following equipment: loading conveyor, sorting platform, sorting conveyor, separating drum, overload conveyor, reverse conveyor, belt that delivers valuable resource faction in automatic press, automatic press, storage tank, or press compactor, conveyor for unloading of the extracted raw materials.

Besides, the new facility will also enable further waste disposal in accordance with the Law of Ukraine "On Waste" (from the 2018 placement of unsorted waste at the landfills is prohibited).

Beneficiary:

PUC “Kremenchutske KATP 1628”

Similar Projects

Reconstruction of water supply and sewerage system of Mariupol city

The aim of the Project  is to succeed the non-stop and quality water supply and wastewater transport. To succeed this aim there are some sub-Project s proposed: Drinking water Rehabilitation of the 4 Water Pumping Stations (WPS) with re-equipment them with new energy efficiency equipment with automatization and implementing the dispatching; building a 3 new WPS,...

Optimization of the district heating systems in the city Oleksandriia

The Project  provides a total heat system reconstruction of Oleksandriya city central part (80% of a total city consumption) with moderate heat system decentralization and implementation of modern energy efficiency equipment. The heat system decentralization predicts heat energy source relocation closer to consumers, into exist heat substations, which located in the middle...

Thermomodernization of the public buildings in Chernigiv

The aim of the Project is to reduce energy consumption of public buildings, improve their technical condition, reduce the risk of accidents of installations operation, improve comfort level and introduce alternative sources of energy for satisfying the demand of hot water in public buildings. The relevance of the Project  for educational and healthcare facilities is caused...

Modernization of the district heating systems in the city Kamianske

The Project  is divided into 2 phases. 1st phase of the Project  includes: Construction of two boiler plants at the sites where the pumping station and the central heat distribution center is located. This will allow to refuse from the purchase of heat from the outside party JSC "Dneprodzerzhinsk HPP" Construction of two boiler plants on existing sites at the sites...

Technical rehabilitation of the water supply and water sewerage systems of Rivne oblast cities

The Project aimed at the reduction of negative environmental impact with improving services of water supply and wastewater transport and treatment. The Project consists of several subproject s that include such works as rehabilitation of worn-out pipe networks of pure water, rehabilitation of water pump stations, technical re-equipment of sewage pumping stations, construction...