Modernization of the district heating system in the city Kamianske

Kamyanske city
Dnipropetrovsk Region
District heating
preparation

Estimated cost

59 089 290  EUR

Brief description:

The Project  is divided into 2 phases.


1st phase of the Project  includes:

  • Construction of two boiler plants at the sites where the pumping station and the central heat distribution center is located. This will allow to refuse from the purchase of heat from the outside party JSC "Dneprodzerzhinsk HPP"
  • Construction of two boiler plants on existing sites at the sites where the pumping station and the central heat distribution center is located which will partly (through the line PS2) to refuse from the purchase of heat from the outside party - JSC "Dneprodzerzhinsk HPP"

 

2nd stage of the Project  includes:

  • Construction of 4 boiler plants at the places of existing facilities, which will allow totally refuse the purchase of heat from the outside party - JSC "Dneprodzerzhinsk HPP
  • Reconstruction of 2 heat supply stations
  • Reconstruction of left-bank located boiler house including installation of the cogeneration equipment, frequency regulation, replacement of the smoke exhausters, fans and pump group, reconstruction of the boiler.

Each of the mentioned above measures will also include measures for modernization of heat supply networks and installation of the house heat metering devices.

Beneficiary:

PUC “Dniprodzerzhynskteploset”

Similar Projects

Modernization of the district heating system in the city Lozova

The Project  includes the modernization of the district heating station by implementation of new energy saving technologies and equipment. Project  implementation will include: Installation of 323 individual heat supply stations Dismantlement of 11 km heat distribution pipelines and replacing of 5.377 km of heat distribution networks with pre-insulated...

Rehabilitation of the public lighting systems with introduction of Energy Efficient technologies in the city Kamianske

The Project  aimed on the increasing of the level of social comfort in the city and reducing of the harmful impact on the environment by reconstruction of the lighting system. The Project  consists of: Rehabilitation of 53 chains of the street lighting using the energy efficiency technologies and automatic systems; Installation of 17 traffic lights with automatic...

Implementation of the Energy Efficiency in buildings in education sector in the city Sumy

It is foreseen within the Project to improve energy efficiency of 33 kindergartens aiming to reduce energy resources usage and create comfort conditions for children and stuff. The following services will be provided: replacement of lighting system, installation of modern energy efficiency equipment, reconstruction of heat supply system, heat pump insulation, replacement of...

Thermomodernization of the public buildings in the city Zaporizhzhia

Thermomodernisation of 14 buildings of public healthcare sector and 46 buildings of public education sector Activities include: insulation of exterior walls, replacement of windows and doors, insulation of roofs, insulation cap, insulation ceiling basement, restoration of drainage system, installation of local ventilation systems with heat recovery, reconstruction of the...

Reconstruction of water supply and sewerage system in the city Mariupol

The aim of the Project  is to succeed the non-stop and quality water supply and wastewater transport. To succeed this aim there are some sub-Project s proposed: Drinking water Rehabilitation of the 4 Water Pumping Stations (WPS) with re-equipment them with new energy efficiency equipment with automatization and implementing the dispatching; building a 3 new WPS,...