Modernization of the district heating system

Lozova city
Kharkiv Region
District heating
preparation

Estimated cost

11 350 270  EUR

Brief description:

The Project  includes the modernization of the district heating station by implementation of new energy saving technologies and equipment.

Project  implementation will include:

  • Installation of 323 individual heat supply stations
  • Dismantlement of 11 km heat distribution pipelines and replacing of 5.377 km of heat distribution networks with pre-insulated pipes
  • Dismantling of old inefficient boilers and installation of new boilers
  • Dismantling of remote from consumers boiler houses and construction of 9 new individual boiler houses nearby consumers. Installing of energy-efficient equipment.

Beneficiary:

PUC “Teploenergo”

Similar Projects

Integrated improvement of solid waste management in the city Lviv

The Project  purpose is to recultivate the existing landfills and establish a modern and efficient system of solid waste management including construction of the waste recycling facility. Implementation of the Project  will allow recycling up to 36% of waste, with a gradual increase in depth processing. The proposed Project  consists of 2 main components: Component 1...

Thermal modernization of the 16 public buildings in Chernihiv

The aim of the Project is to reduce energy consumption of public buildings, improve their technical condition, reduce the risk of accidents of installations operation, improve comfort level and introduce alternative sources of energy for satisfying the demand of hot water in public buildings. The relevance of the Project  for educational and healthcare facilities is caused...

Thermal modernization of the 90 public buildings (schools, kindergartens) of Ternopil

The Project involves thermal modernization of 52 schools (gross area 184553 m2) and 38 kindergartens (gross area 67653 m2). It includes the following measures: repair of external insulation, light systems, air ventilation and conditioning systems, and installation of modern equipment. The aim of the Project to improve comfort level, reduce energy consumption, save energy...

Thermomodernisation of public buildings of Education, Science, Sport and Healthcare sectors in Kamyanske (former Dniprodzerzhynsk)

Project aims at deep thermal modernisation of 38 public buildings – kindergartens, schools, healthcare and sport...

Complex modernization water supply and sewerage systems of Lutsk

The Project  consists of the several subprojects: Rehabilitation of the water treatment plant (WTP) in city Lutsk; Rehabilitation of the waste water treatment plant (WWTP); Modernization of the existing Waste Water Pumping Stations (WWPS) #1, 2, 3, 5; Rehabilitation of the water pipeline with L=7km, with replacing steel pipes with D=600 mm for plastic with...