Modernization of the district heating systems in the city Kamyanske (former Dniprodzerzhynsk)

Kamyanske city
Dnipropetrovsk Region
District heating
preparation

Estimated cost

59 089 290  EUR

Brief description:

The Project  is divided into 2 phases.


1st phase of the Project  includes:

  • Construction of two boiler plants at the sites where the pumping station and the central heat distribution center is located. This will allow to refuse from the purchase of heat from the outside party JSC "Dneprodzerzhinsk HPP"
  • Construction of two boiler plants on existing sites at the sites where the pumping station and the central heat distribution center is located which will partly (through the line PS2) to refuse from the purchase of heat from the outside party - JSC "Dneprodzerzhinsk HPP"

 

2nd stage of the Project  includes:

  • Construction of 4 boiler plants at the places of existing facilities, which will allow totally refuse the purchase of heat from the outside party - JSC "Dneprodzerzhinsk HPP
  • Reconstruction of 2 heat supply stations
  • Reconstruction of left-bank located boiler house including installation of the cogeneration equipment, frequency regulation, replacement of the smoke exhausters, fans and pump group, reconstruction of the boiler.

Each of the mentioned above measures will also include measures for modernization of heat supply networks and installation of the house heat metering devices.

Beneficiary:

PUC “Dniprodzerzhynskteploset”

Similar Projects

Reconstruction of water supply and sewerage system of Mariupol city

The aim of the Project  is to succeed the non-stop and quality water supply and wastewater transport. To succeed this aim there are some sub-Project s proposed: Drinking water Rehabilitation of the 4 Water Pumping Stations (WPS) with re-equipment them with new energy efficiency equipment with automatization and implementing the dispatching; building a 3 new WPS,...

Thermomodernisation of the public buildings in Zaporizhzhia

Thermomodernisation of 14 buildings of public healthcare sector and 46 buildings of public education sector Activities include: insulation of exterior walls, replacement of windows and doors, insulation of roofs, insulation cap, insulation ceiling basement, restoration of drainage system, installation of local ventilation systems with heat recovery, reconstruction of the...

Construction of new Deyiv Hora landfill facility and Improvement of solid waste management in the city Kremenchuk

The Project provides for the construction of solid waste sorting line with the annual capacity from 50 to 100 thousand tons. Waste recycling will include the following equipment: loading conveyor, sorting platform, sorting conveyor, separating drum, overload conveyor, reverse conveyor, belt that delivers valuable resource faction in automatic press, automatic press, storage...

Thermomodernisation of public buildings of Education, Science, Sport and Healthcare sectors in Kamyanske (former Dniprodzerzhynsk)

Project aims at deep thermal modernisation of 38 public buildings – kindergartens, schools, healthcare and sport...

Reconstruction of the waste water treatment facilities in Chornomorsk (former Illichivsk) city

Construction the new facilities for treatment of sewage on the existing WWTP without stopping the process of waste water treatment. Capacity  - 15000 m3/day. Regarding the Project  there will be a construction of: Receiving bowl Sand trap with aeration system Primary decanter Anaerobic reactor Aerotank Secondary decanter Sludge PS Facilities for air...