New construction and rehabilitation of the heating boilers in the city Kremenchuk

Kremenchug city
Poltava Region
District heating
preparation

Estimated cost

10 166 900 EUR

Brief description:

  • Construction public utility heat generation capacities in the district Rakivka, Kremenchug
  • Reconstruction of 17 district boiler house on the 300a, Prihodko str., Kremenchug city, Poltava region
  • Heating pipeline from 17th boiler house to 620 district boiler house.


Replacement of existing heating networks D=219x6 at the part TK1-TK9 (from the 17th district boiler house) on the Project ed D=273/400. The heating network new part construction D=219/315 from the existing heating chamber TK18 (from 17th district boiler networks) up to existing TK11 (620 district networks). Construction of a new heating network part D=50/125 along Kuznechniy str.

Beneficiary:

PUC “Teploenergo”

Similar Projects

Reconstruction and modernisation of public lighting system of Mariupol

The Project aims on modernization of the outdoor lighting system in Mariupol by replacing of 27.7 thsd. of lighting points (LED) and installation of 7.7 additional lighting points with replacing of lighting...

Construction of new Deyiv Hora landfill facility and Improvement of solid waste management in the city Kremenchuk

The Project provides for the construction of solid waste sorting line with the annual capacity from 50 to 100 thousand tons. Waste recycling will include the following equipment: loading conveyor, sorting platform, sorting conveyor, separating drum, overload conveyor, reverse conveyor, belt that delivers valuable resource faction in automatic press, automatic press, storage...

Modernization of the heat supply system of the Kryvy Rih city (stage 1)

The project includes the following activities: - construction of 4 new boiler houses; - modernization of the "Gigant" boiler house of the communal enterprise "Krivorozhteplomerezha"; - reconstruction of the boiler house "Mekhanobrchormet" of the communal enterprise "Krivorozhteplomerezha"; - replacement of pipeline networks with optimization of existing...

Implementation of the Energy Efficiency in 33 buildings of education sector in Sumy

It is foreseen within the Project to improve energy efficiency of 33 kindergartens aiming to reduce energy resources usage and create comfort conditions for children and stuff. The following services will be provided: replacement of lighting system, installation of modern energy efficiency equipment, reconstruction of heat supply system, heat pump insulation, replacement of...

Reconstruction of water supply and sewerage system of Mariupol city

The aim of the Project  is to succeed the non-stop and quality water supply and wastewater transport. To succeed this aim there are some sub-Project s proposed: Drinking water Rehabilitation of the 4 Water Pumping Stations (WPS) with re-equipment them with new energy efficiency equipment with automatization and implementing the dispatching; building a 3 new WPS,...