Thermal renovation of public healthcare buildings of Volyn oblast

Volyn region
Volyn Region
Energy efficiency
preparation

Estimated cost

9 724 860  EUR

Brief description:

The Project  involves 64 buildings with next EE measures implementation:

  • Conducting of building’s’ walls thermal renovation.
  • Windows and doors replacement on energy saving ones.
  • Lightning system modernization in buildings.
  • Integration of energy consumption monitoring system on daily base.
  • Integration of heating regulation system according to weather and temperature.

Beneficiary:

PUC «Volynenergosoft»

Similar Projects

Thermomodernisation of the public buildings in Zaporizhzhia

Thermomodernisation of 14 buildings of public healthcare sector and 46 buildings of public education sector Activities include: insulation of exterior walls, replacement of windows and doors, insulation of roofs, insulation cap, insulation ceiling basement, restoration of drainage system, installation of local ventilation systems with heat recovery, reconstruction of the...

Rehabilitation of street lighting in Dnipro (former Dnipropetrovsk)

Replacement of technologically and physically obsolete lamps with incandescent with mercury arc lamp DRL, high-pressure sodium arc lamps with LED lamps of 42 W, 139 W. Reconstruction of cable-air lines with the use of the latest technologies (isolated wires). Energy savings expected up to 50% of...

Optimization of the district heating systems in the city of Oleksandriya

The Project  provides a total heat system reconstruction of Oleksandriya city central part (80% of a total city consumption) with moderate heat system decentralization and implementation of modern energy efficiency equipment. The heat system decentralization predicts heat energy source relocation closer to consumers, into exist heat substations, which located in the middle...

Reconstruction and modernisation of public lighting system of Mariupol

The Project aims on modernization of the outdoor lighting system in Mariupol by replacing of 27.7 thsd. of lighting points (LED) and installation of 7.7 additional lighting points with replacing of lighting...

Reconstruction of water supply and sewerage system of Mariupol city

The aim of the Project  is to succeed the non-stop and quality water supply and wastewater transport. To succeed this aim there are some sub-Project s proposed: Drinking water Rehabilitation of the 4 Water Pumping Stations (WPS) with re-equipment them with new energy efficiency equipment with automatization and implementing the dispatching; building a 3 new WPS,...