preparation

Estimated cost

15 934 660 EUR

Brief description:

The Project aims on modernization of the outdoor lighting system in Mariupol by replacing of 27.7 thsd. of lighting points (LED) and installation of 7.7 additional lighting points with replacing of lighting networks.

Beneficiary:

PUC “Misksvitlo”

Similar Projects

New construction and rehabilitation of the heating boilers in the city Kremenchuk

Construction public utility heat generation capacities in the district Rakivka, Kremenchug Reconstruction of 17 district boiler house on the 300a, Prihodko str., Kremenchug city, Poltava region Heating pipeline from 17th boiler house to 620 district boiler house. Replacement of existing heating networks D=219x6 at the part TK1-TK9 (from the 17th district boiler...

Complex modernization water supply and sewerage systems of Lutsk

The Project  consists of the several subprojects: Rehabilitation of the water treatment plant (WTP) in city Lutsk; Rehabilitation of the waste water treatment plant (WWTP); Modernization of the existing Waste Water Pumping Stations (WWPS) #1, 2, 3, 5; Rehabilitation of the water pipeline with L=7km, with replacing steel pipes with D=600 mm for plastic with...

Implementation of the Energy Efficiency in 33 buildings of education sector in Sumy

It is foreseen within the Project to improve energy efficiency of 33 kindergartens aiming to reduce energy resources usage and create comfort conditions for children and stuff. The following services will be provided: replacement of lighting system, installation of modern energy efficiency equipment, reconstruction of heat supply system, heat pump insulation, replacement of...

Reconstruction of the waste water treatment facilities in Chornomorsk (former Illichivsk) city

Construction the new facilities for treatment of sewage on the existing WWTP without stopping the process of waste water treatment. Capacity  - 15000 m3/day. Regarding the Project  there will be a construction of: Receiving bowl Sand trap with aeration system Primary decanter Anaerobic reactor Aerotank Secondary decanter Sludge PS Facilities for air...

Construction of new Deyiv Hora landfill facility and Improvement of solid waste management in the city Kremenchuk

The Project provides for the construction of solid waste sorting line with the annual capacity from 50 to 100 thousand tons. Waste recycling will include the following equipment: loading conveyor, sorting platform, sorting conveyor, separating drum, overload conveyor, reverse conveyor, belt that delivers valuable resource faction in automatic press, automatic press, storage...