Rehabilitation of street lighting in Dnipro (former Dnipropetrovsk)

Dnipro city
Dnipropetrovsk Region
Municipal lighting
preparation

Estimated cost

20 400 000  EUR

Brief description:

  • Replacement of technologically and physically obsolete lamps with incandescent with mercury arc lamp DRL, high-pressure sodium arc lamps with LED lamps of 42 W, 139 W.
  • Reconstruction of cable-air lines with the use of the latest technologies (isolated wires).

Energy savings expected up to 50% of consumption.

Beneficiary:

PUC “Misksvitlo”

Similar Projects

Modernization of the heat supply system of the Kryvy Rih city (stage 1)

The project includes the following activities: - construction of 4 new boiler houses; - modernization of the "Gigant" boiler house of the communal enterprise "Krivorozhteplomerezha"; - reconstruction of the boiler house "Mekhanobrchormet" of the communal enterprise "Krivorozhteplomerezha"; - replacement of pipeline networks with optimization of existing...

Reconstruction and modernisation of public lighting system of Mariupol

The Project aims on modernization of the outdoor lighting system in Mariupol by replacing of 27.7 thsd. of lighting points (LED) and installation of 7.7 additional lighting points with replacing of lighting...

Reconstruction of water supply and sewerage system of Mariupol city

The aim of the Project  is to succeed the non-stop and quality water supply and wastewater transport. To succeed this aim there are some sub-Project s proposed: Drinking water Rehabilitation of the 4 Water Pumping Stations (WPS) with re-equipment them with new energy efficiency equipment with automatization and implementing the dispatching; building a 3 new WPS,...

Thermomodernisation of public buildings of Education, Science, Sport and Healthcare sectors in Kamyanske (former Dniprodzerzhynsk)

Project aims at deep thermal modernisation of 38 public buildings – kindergartens, schools, healthcare and sport...

Construction of new Deyiv Hora landfill facility and Improvement of solid waste management in the city Kremenchuk

The Project provides for the construction of solid waste sorting line with the annual capacity from 50 to 100 thousand tons. Waste recycling will include the following equipment: loading conveyor, sorting platform, sorting conveyor, separating drum, overload conveyor, reverse conveyor, belt that delivers valuable resource faction in automatic press, automatic press, storage...