Construction of new Deyiv Hora landfill facility and Improvement of solid waste management in the city Kremenchuk

Kremenchug city
Poltava Region
Solid waste
preparation

Estimated cost

10 000 000 EUR

Brief description:

The Project provides for the construction of solid waste sorting line with the annual capacity from 50 to 100 thousand tons. Waste recycling will include the following equipment: loading conveyor, sorting platform, sorting conveyor, separating drum, overload conveyor, reverse conveyor, belt that delivers valuable resource faction in automatic press, automatic press, storage tank, or press compactor, conveyor for unloading of the extracted raw materials.

Besides, the new facility will also enable further waste disposal in accordance with the Law of Ukraine "On Waste" (from the 2018 placement of unsorted waste at the landfills is prohibited).

Beneficiary:

PUC “Kremenchutske KATP 1628”

Similar Projects

Thermomodernisation of the public buildings in Zaporizhzhia

Thermomodernisation of 14 buildings of public healthcare sector and 46 buildings of public education sector Activities include: insulation of exterior walls, replacement of windows and doors, insulation of roofs, insulation cap, insulation ceiling basement, restoration of drainage system, installation of local ventilation systems with heat recovery, reconstruction of the...

Thermal renovation of public healthcare buildings of Volyn oblast

The Project  involves 64 buildings with next EE measures implementation: Conducting of building’s’ walls thermal renovation. Windows and doors replacement on energy saving ones. Lightning system modernization in buildings. Integration of energy consumption monitoring system on daily base. Integration of heating regulation system according to weather and...

New construction and rehabilitation of the heating boilers in the city Kremenchuk

Construction public utility heat generation capacities in the district Rakivka, Kremenchug Reconstruction of 17 district boiler house on the 300a, Prihodko str., Kremenchug city, Poltava region Heating pipeline from 17th boiler house to 620 district boiler house. Replacement of existing heating networks D=219x6 at the part TK1-TK9 (from the 17th district boiler...

Modernization of the district heating systems in the city Kamyanske (former Dniprodzerzhynsk)

The Project  is divided into 2 phases. 1st phase of the Project  includes: Construction of two boiler plants at the sites where the pumping station and the central heat distribution center is located. This will allow to refuse from the purchase of heat from the outside party JSC "Dneprodzerzhinsk HPP" Construction of two boiler plants on existing sites at the sites...

Reconstruction and modernisation of public lighting system of Mariupol

The Project aims on modernization of the outdoor lighting system in Mariupol by replacing of 27.7 thsd. of lighting points (LED) and installation of 7.7 additional lighting points with replacing of lighting...