Complex modernization water supply and sewerage systems of Lutsk

Lutsk city
Volyn Region
Water supply, wastewater
preparation

Estimated cost

11 812 750  EUR

Brief description:

The Project  consists of the several subprojects:

  • Rehabilitation of the water treatment plant (WTP) in city Lutsk;
  • Rehabilitation of the waste water treatment plant (WWTP);
  • Modernization of the existing Waste Water Pumping Stations (WWPS) #1, 2, 3, 5;
  • Rehabilitation of the water pipeline with L=7km, with replacing steel pipes with D=600 mm for plastic with D=450mm;
  • Replacing the old worn-out special vehicles with a new more efficient.

Beneficiary:

PUC “Lutskvodokanal”

Similar Projects

Complex modernization water supply and sewerage systems of Lutsk

The Project  consists of the several subprojects: Rehabilitation of the water treatment plant (WTP) in city Lutsk; Rehabilitation of the waste water treatment plant (WWTP); Modernization of the existing Waste Water Pumping Stations (WWPS) #1, 2, 3, 5; Rehabilitation of the water pipeline with L=7km, with replacing steel pipes with D=600 mm for plastic with...

Reconstruction of the waste water treatment facilities in Chornomorsk (former Illichivsk) city

Construction the new facilities for treatment of sewage on the existing WWTP without stopping the process of waste water treatment. Capacity  - 15000 m3/day. Regarding the Project  there will be a construction of: Receiving bowl Sand trap with aeration system Primary decanter Anaerobic reactor Aerotank Secondary decanter Sludge PS Facilities for air...

Construction of new Deyiv Hora landfill facility and Improvement of solid waste management in the city Kremenchuk

The Project provides for the construction of solid waste sorting line with the annual capacity from 50 to 100 thousand tons. Waste recycling will include the following equipment: loading conveyor, sorting platform, sorting conveyor, separating drum, overload conveyor, reverse conveyor, belt that delivers valuable resource faction in automatic press, automatic press, storage...

Complex thermal modernization of public buildings

After analysing current state of public buildings energy consumption, it was proposed to implement the following measures: Indoor lighting system modernization in order to ensure the normative level of lighting; Thermal insulation and individual heating substation installation to ensure energy efficiency; Window replacement and facade...

Thermal modernization of the 90 public buildings (schools, kindergartens) of Ternopil

The Project involves thermal modernization of 52 schools (gross area 184553 m2) and 38 kindergartens (gross area 67653 m2). It includes the following measures: repair of external insulation, light systems, air ventilation and conditioning systems, and installation of modern equipment. The aim of the Project to improve comfort level, reduce energy consumption, save energy...