Reconstruction of the waste water treatment facilities in Chornomorsk (former Illichivsk) city

Illichivsk city
Odessa Region
Water supply, wastewater
preparation

Estimated cost

19 000 000 EUR

Brief description:

Construction the new facilities for treatment of sewage on the existing WWTP without stopping the process of waste water treatment. Capacity  - 15000 m3/day.

Regarding the Project  there will be a construction of:

  • Receiving bowl
  • Sand trap with aeration system
  • Primary decanter
  • Anaerobic reactor
  • Aerotank
  • Secondary decanter
  • Sludge PS
  • Facilities for air blowers
  • Facilities for sludge dewatering and treatment

Nitrification and denitrification are used for improvement the treatment of waste water from the phosphorus and nitrogen.

The process of sludge fugate and wastewater treatment is going in anaerobic reactor for reduce the concentration of phosphorus.

Disinfection of the wastewater is going to be by ultraviolet lamps.

After the treatment the sludge is going to the process of dewatering and utilization.

Beneficiary:

PUC “ChernomorskVodokanal”

Similar Projects

Reconstruction of the waste water treatment facilities in Chornomorsk (former Illichivsk) city

Construction the new facilities for treatment of sewage on the existing WWTP without stopping the process of waste water treatment. Capacity  - 15000 m3/day. Regarding the Project  there will be a construction of: Receiving bowl Sand trap with aeration system Primary decanter Anaerobic reactor Aerotank Secondary decanter Sludge PS Facilities for air...

Implementation of the Energy Efficiency in 33 buildings of education sector in Sumy

It is foreseen within the Project to improve energy efficiency of 33 kindergartens aiming to reduce energy resources usage and create comfort conditions for children and stuff. The following services will be provided: replacement of lighting system, installation of modern energy efficiency equipment, reconstruction of heat supply system, heat pump insulation, replacement of...

Complex thermal modernization of public buildings

After analysing current state of public buildings energy consumption, it was proposed to implement the following measures: Indoor lighting system modernization in order to ensure the normative level of lighting; Thermal insulation and individual heating substation installation to ensure energy efficiency; Window replacement and facade...

Thermomodernisation of the public buildings in Zaporizhzhia

Thermomodernisation of 14 buildings of public healthcare sector and 46 buildings of public education sector Activities include: insulation of exterior walls, replacement of windows and doors, insulation of roofs, insulation cap, insulation ceiling basement, restoration of drainage system, installation of local ventilation systems with heat recovery, reconstruction of the...

Optimization of the district heating systems in the city of Oleksandriya

The Project  provides a total heat system reconstruction of Oleksandriya city central part (80% of a total city consumption) with moderate heat system decentralization and implementation of modern energy efficiency equipment. The heat system decentralization predicts heat energy source relocation closer to consumers, into exist heat substations, which located in the middle...