Reconstruction of water supply and sewerage system of Mariupol city

Mariupol city
Donetsk Region
Water supply, wastewater
preparation

Estimated cost

32 409 710  EUR

Brief description:

The aim of the Project  is to succeed the non-stop and quality water supply and wastewater transport. To succeed this aim there are some sub-Project s proposed:

Drinking water

  • Rehabilitation of the 4 Water Pumping Stations (WPS) with re-equipment them with new energy efficiency equipment with automatization and implementing the dispatching; building a 3 new WPS, rehabilitation of the existing sections of water supply pipes network with installation new pumps in the existing building, re-equipment of the old networks with changing the old steel pipes for new plastic (370 km).

Wastewater

  • Construction of a new Waste Water Pumping Station (WWPS) #9;
  • Rehabilitation of the biological wastewater treatment plant
  • Construction of the section of the waste collector which is located on the sea area (1,5 km length)

Beneficiary:

PUC “Mariupol Administration of water supply and sewerage systems”

Similar Projects

Modernization of the district heating system

The Project  includes the modernization of the district heating station by implementation of new energy saving technologies and equipment. Project  implementation will include: Installation of 323 individual heat supply stations Dismantlement of 11 km heat distribution pipelines and replacing of 5.377 km of heat distribution networks with pre-insulated...

Implementation of the Energy Efficiency in 33 buildings of education sector in Sumy

It is foreseen within the Project to improve energy efficiency of 33 kindergartens aiming to reduce energy resources usage and create comfort conditions for children and stuff. The following services will be provided: replacement of lighting system, installation of modern energy efficiency equipment, reconstruction of heat supply system, heat pump insulation, replacement of...

Complex modernization water supply and sewerage systems of Lutsk

The Project  consists of the several subprojects: Rehabilitation of the water treatment plant (WTP) in city Lutsk; Rehabilitation of the waste water treatment plant (WWTP); Modernization of the existing Waste Water Pumping Stations (WWPS) #1, 2, 3, 5; Rehabilitation of the water pipeline with L=7km, with replacing steel pipes with D=600 mm for plastic with...

Modernization of the district heating systems in the city Kamyanske (former Dniprodzerzhynsk)

The Project  is divided into 2 phases. 1st phase of the Project  includes: Construction of two boiler plants at the sites where the pumping station and the central heat distribution center is located. This will allow to refuse from the purchase of heat from the outside party JSC "Dneprodzerzhinsk HPP" Construction of two boiler plants on existing sites at the sites...

Replacement of the natrium street lighting to LED system

This Project envisages replacement of the existing lamps by new one, as well as replacement of some other elements (cables, teleautomatics) solely, and does not include any elements that will provide new services. Taking into account, that the street lighting in the city of Kyiv does not have any overabundance (it is installed only in places, where it is needed for the...