Rehabilitation of Public lighting in the city Dnipro

Dnipro city
Dnipropetrovsk Region
Municipal lighting
preparation

Estimated cost

22 320 000 EUR

Brief description:

  • Replacement of technologically and physically obsolete lamps with incandescent with mercury arc lamp DRL, high-pressure sodium arc lamps with LED lamps of 42 W, 139 W.
  • Reconstruction of cable-air lines with the use of the latest technologies (isolated wires).

Energy savings expected up to 50% of consumption.

Beneficiary:

PUC “Misksvitlo”

Similar Projects

Implementation of the Energy Efficiency in buildings in education sector in the city Sumy

It is foreseen within the Project to improve energy efficiency of 33 kindergartens aiming to reduce energy resources usage and create comfort conditions for children and stuff. The following services will be provided: replacement of lighting system, installation of modern energy efficiency equipment, reconstruction of heat supply system, heat pump insulation, replacement of...

Thermal renovation of public healthcare buildings in the Volyn region

The Project  involves 64 buildings with next EE measures implementation: Conducting of building’s’ walls thermal renovation. Windows and doors replacement on energy saving ones. Lightning system modernization in buildings. Integration of energy consumption monitoring system on daily base. Integration of heating regulation system according to weather and...

Rehabilitation of Public lighting in the city Dnipro

Replacement of technologically and physically obsolete lamps with incandescent with mercury arc lamp DRL, high-pressure sodium arc lamps with LED lamps of 42 W, 139 W. Reconstruction of cable-air lines with the use of the latest technologies (isolated wires). Energy savings expected up to 50% of...

Modernization of the district heating system in the city Lozova

The Project  includes the modernization of the district heating station by implementation of new energy saving technologies and equipment. Project  implementation will include:   Rehabilitation of about 2 km (length of channels) of district heating networks, optimizing existing diameters; Design, supply, and installation of boiler houses BH TRS №6 (14 MW), BH...

Modernisation of the heating system in the city Kryvyi Rih (I stage) - 1 DNI 001

As per Project Implementation Plan developed 2020 the project includes the following components: Component 1: Modernisation of more than 7 km district heating networks Component 2: Boiler Houses: Decommissioning of the boilers at the Kryvorizhstal BH (KMK) and the district heating mains from KMK Splitting of heat loads into three zones and hydraulic...