Rehabilitation of street lighting in Dnipro (former Dnipropetrovsk)

Dnipro city
Dnipropetrovsk Region
Municipal lighting
preparation

Estimated cost

22 320 000 EUR

Brief description:

  • Replacement of technologically and physically obsolete lamps with incandescent with mercury arc lamp DRL, high-pressure sodium arc lamps with LED lamps of 42 W, 139 W.
  • Reconstruction of cable-air lines with the use of the latest technologies (isolated wires).

Energy savings expected up to 50% of consumption.

Beneficiary:

PUC “Misksvitlo”

Similar Projects

Rehabilitation of the outdoor lighting systems with introduction of Energy Efficient technologies in Kamyanske (former Dniprodzerzhynsk)

The Project  aimed on the increasing of the level of social comfort in the city and reducing of the harmful impact on the environment by reconstruction of the lighting system. The Project  consists of: Rehabilitation of 53 chains of the street lighting using the energy efficiency technologies and automatic systems; Installation of 17 traffic lights with automatic...

Complex thermal modernization of public buildings

After analysing current state of public buildings energy consumption, it was proposed to implement the following measures: Indoor lighting system modernization in order to ensure the normative level of lighting; Thermal insulation and individual heating substation installation to ensure energy efficiency; Window replacement and facade...

Thermomodernisation of public buildings of Education, Science, Sport and Healthcare sectors in Kamyanske (former Dniprodzerzhynsk)

Project aims at deep thermal modernisation of 38 public buildings – kindergartens, schools, healthcare and sport...

Thermomodernization of the public buildings in Chernigiv

The aim of the Project is to reduce energy consumption of public buildings, improve their technical condition, reduce the risk of accidents of installations operation, improve comfort level and introduce alternative sources of energy for satisfying the demand of hot water in public buildings. The relevance of the Project  for educational and healthcare facilities is caused...

Construction of new Deyiv Hora landfill facility and Improvement of solid waste management in the city Kremenchuk

The Project provides for the construction of solid waste sorting line with the annual capacity from 50 to 100 thousand tons. Waste recycling will include the following equipment: loading conveyor, sorting platform, sorting conveyor, separating drum, overload conveyor, reverse conveyor, belt that delivers valuable resource faction in automatic press, automatic press, storage...