Replacement of the natrium street lighting to LED system

Kyiv city
Kiev Region
Municipal lighting
preparation

Estimated cost

36 000 000 EUR

Brief description:

This Project envisages replacement of the existing lamps by new one, as well as replacement of some other elements (cables, teleautomatics) solely, and does not include any elements that will provide new services.

Taking into account, that the street lighting in the city of Kyiv does not have any overabundance (it is installed only in places, where it is needed for the citizens), thus, the Project envisages exclusively measures, which meet the requirements of ultimate users (residents of the city).

Beneficiary:

PUC “Kyivmisksvitlo”

Similar Projects

Complex modernization water supply and sewerage systems of Lutsk

The Project  consists of the several subprojects: Rehabilitation of the water treatment plant (WTP) in city Lutsk; Rehabilitation of the waste water treatment plant (WWTP); Modernization of the existing Waste Water Pumping Stations (WWPS) #1, 2, 3, 5; Rehabilitation of the water pipeline with L=7km, with replacing steel pipes with D=600 mm for plastic with...

Rehabilitation of street lighting in Dnipro (former Dnipropetrovsk)

Replacement of technologically and physically obsolete lamps with incandescent with mercury arc lamp DRL, high-pressure sodium arc lamps with LED lamps of 42 W, 139 W. Reconstruction of cable-air lines with the use of the latest technologies (isolated wires). Energy savings expected up to 50% of...

Technical rehabilitation of the water supply and water sewerage systems of Rivne oblast cities

The Project aimed at the reduction of negative environmental impact with improving services of water supply and wastewater transport and treatment. The Project consists of several subproject s that include such works as rehabilitation of worn-out pipe networks of pure water, rehabilitation of water pump stations, technical re-equipment of sewage pumping stations, construction...

Modernization of the district heating systems in the city Kamyanske (former Dniprodzerzhynsk)

The Project  is divided into 2 phases. 1st phase of the Project  includes: Construction of two boiler plants at the sites where the pumping station and the central heat distribution center is located. This will allow to refuse from the purchase of heat from the outside party JSC "Dneprodzerzhinsk HPP" Construction of two boiler plants on existing sites at the sites...

Reconstruction and modernisation of public lighting system of Mariupol

The Project aims on modernization of the outdoor lighting system in Mariupol by replacing of 27.7 thsd. of lighting points (LED) and installation of 7.7 additional lighting points with replacing of lighting...