Thermal renovation of public healthcare buildings of Volyn oblast

LUTSK CITY
Volyn Region
Energy efficiency
preparation

Estimated cost

9 700 000  EUR

Brief description:

The Project  involves 64 buildings with next EE measures implementation:

  • Conducting of building’s’ walls thermal renovation.
  • Windows and doors replacement on energy saving ones.
  • Lightning system modernization in buildings.
  • Integration of energy consumption monitoring system on daily base.
  • Integration of heating regulation system according to weather and temperature.

Beneficiary:

PUC «Volynenergosoft»

Similar Projects

Thermomodernization of the public buildings in Chernigiv

The aim of the Project is to reduce energy consumption of public buildings, improve their technical condition, reduce the risk of accidents of installations operation, improve comfort level and introduce alternative sources of energy for satisfying the demand of hot water in public buildings. The relevance of the Project  for educational and healthcare facilities is caused...

Modernization of the district heating systems in the city Kamianske

The Project  is divided into 2 phases. 1st phase of the Project  includes: Construction of two boiler plants at the sites where the pumping station and the central heat distribution center is located. This will allow to refuse from the purchase of heat from the outside party JSC "Dneprodzerzhinsk HPP" Construction of two boiler plants on existing sites at the sites...

Construction of new Deyiv Hora landfill facility and Improvement of solid waste management in the city Kremenchuk

The Project provides for the construction of solid waste sorting line with the annual capacity from 50 to 100 thousand tons. Waste recycling will include the following equipment: loading conveyor, sorting platform, sorting conveyor, separating drum, overload conveyor, reverse conveyor, belt that delivers valuable resource faction in automatic press, automatic press, storage...

Complex modernization water supply and sewerage systems of Lutsk

The Project  consists of the several subprojects: Rehabilitation of the water treatment plant (WTP) in city Lutsk; Rehabilitation of the waste water treatment plant (WWTP); Modernization of the existing Waste Water Pumping Stations (WWPS) #1, 2, 3, 5; Rehabilitation of the water pipeline with L=7km, with replacing steel pipes with D=600 mm for plastic with...

Rehabilitation of street lighting in Dnipro (former Dnipropetrovsk)

Replacement of technologically and physically obsolete lamps with incandescent with mercury arc lamp DRL, high-pressure sodium arc lamps with LED lamps of 42 W, 139 W. Reconstruction of cable-air lines with the use of the latest technologies (isolated wires). Energy savings expected up to 50% of...