Thermal modernization of the public buildings (schools, kindergartens) in the city Ternopil
Ternopil city
Ternopil Region
Energy efficiency
preparation
Estimated cost
30 490 020 EUR
![](/wp-content/uploads/2017/09/3_TER_034.png)
Brief description:
The Project involves thermal modernization of 52 schools (gross area 184553 m2) and 38 kindergartens (gross area 67653 m2).
It includes the following measures: repair of external insulation, light systems, air ventilation and conditioning systems, and installation of modern equipment.
The aim of the Project to improve comfort level, reduce energy consumption, save energy costs, and extend the lifetime of the buildings.
Beneficiary:
Ternopil City Council
Similar Projects
Integrated improvement of solid waste management in the city Lviv
The Project purpose is to recultivate the existing landfills and establish a modern and efficient system of solid waste management including construction of the waste recycling facility.
Implementation of the Project will allow recycling up to 36% of waste, with a gradual increase in depth processing.
The proposed Project consists of 2 main components:
Component 1...
Rehabilitation of the public lighting systems with introduction of Energy Efficient technologies in the city Kamianske
The Project aimed on the increasing of the level of social comfort in the city and reducing of the harmful impact on the environment by reconstruction of the lighting system.
The Project consists of:
Rehabilitation of 53 chains of the street lighting using the energy efficiency technologies and automatic systems;
Installation of 17 traffic lights with automatic...
Complex modernization of water supply and sewerage systems in the city Lutsk
The overall purpose of water supply and wastewater disposal systems’ modernization in Lutsk is to reduce the negative impact on the environment and to improve water supply services, transportation and wastewater treatment in the city. Project implementation will lead to significant energy saving, reduction of water losses in the networks, improvement of the hydrological...
Reconstruction and modernisation of public lighting system in the city Mariupol
The Project aims on modernization of the outdoor lighting system in Mariupol by replacing of 27.7 thsd. of lighting points (LED) and installation of 7.7 additional lighting points with replacing of lighting networks.
...
Modernisation of the heating system in the city Kryvyi Rih (I stage) - 1 DNI 001
As per Project Implementation Plan developed 2020 the project includes the following components:
Component 1: Modernisation of more than 7 km district heating networks
Component 2: Boiler Houses:
Decommissioning of the boilers at the Kryvorizhstal BH (KMK) and the district heating mains from KMK
Splitting of heat loads into three zones and hydraulic...