Projects

Types

All types
District heating
Energy efficiency
Municipal lighting
Solid waste
Water supply, wastewater

Region

All regions
Cherkasy Region
Chernihiv Region
Chernivtsi Region
Crimea Region
Dnipropetrovsk Region
Donetsk Region
Ivano-Frankivsk Region
Kharkiv Region
Kherson Region
Khmelnytskyi Region
Kiev Region
Kirovohrad Region
Luhansk Region
Lviv Region
Mykolaiv Region
Odessa Region
Poltava Region
Rivne Region
Sumy Region
Ternopil Region
Vinnytsia Region
Volyn Region
Zakarpattia Region
Zaporizhia Region
Zhytomyr Region

Status

All statuses
preparation
implementation
completed

Rehabilitation of Public lighting in the city Dnipro

Dnipro city
Dnipropetrovsk Region
Municipal lighting
preparation
  • Replacement of technologically and physically obsolete lamps with incandescent with mercury arc lamp DRL, high-pressure sodium arc lamps with LED lamps of 42 W, 139 W.
  • Reconstruction of cable-air lines with the use of the latest technologies (isolated wires).

Energy savings expected up to 50% of consumption.

Thermomodernisation of public buildings in Education, Science, Sport and Healthcare sectors in the city Kamianske

Kamianske city
Dnipropetrovsk Region
Energy efficiency
preparation

Project aims at deep thermal modernisation of 38 public buildings – kindergartens, schools, healthcare and sport halls.

Rehabilitation of the public lighting systems with introduction of Energy Efficient technologies in the city Kamianske

Kamianske city
Dnipropetrovsk Region
Municipal lighting
preparation

The Project  aimed on the increasing of the level of social comfort in the city and reducing of the harmful impact on the environment by reconstruction of the lighting system.

The Project  consists of:

  • Rehabilitation of 53 chains of the street lighting using the energy efficiency technologies and automatic systems;
  • Installation of 17 traffic lights with automatic management systems;
  • Installation of 160 photovoltaic stations (optionally).

Modernisation of the heating system in the city Kryvyi Rih (I stage) - 1 DNI 001

Kryviy Rih city
Dnipropetrovsk Region
District heating
preparation

As per Project Implementation Plan developed 2020 the project includes the following components:

Component 1: Modernisation of more than 7 km district heating networks

Component 2: Boiler Houses:

  • Decommissioning of the boilers at the Kryvorizhstal BH (KMK) and the district heating mains from KMK
  • Splitting of heat loads into three zones and hydraulic calculation
  • Reconstruction of the Gigant and Mekhanobrchormet boiler houses financed by EIB loan
  • Reconstruction of Kryvorizhstal boiler house funded by municipal budget
  • Introduction of systems for monitoring and control of boiler houses operation (SCADA at boiler houses and the Central Dispatch Post)

The total installed heating capacity of the boiler houses to be modernised is 181.6 MW.

 

Component 3: Demand-Side Measures – Installation of Individual Heat Substations with SCADA in more than 370 public-sector buildings

Component 4: Construction Supervision

Complex rehabilitation of public lighting system in the city Kyiv

Kyiv city
Kiev Region
Municipal lighting
preparation

This Project envisages replacement of the existing lamps by new one, as well as replacement of some other elements (cables, teleautomatics) solely, and does not include any elements that will provide new services.

Taking into account, that the street lighting in the city of Kyiv does not have any overabundance (it is installed only in places, where it is needed for the citizens), thus, the Project envisages exclusively measures, which meet the requirements of ultimate users (residents of the city).

Page 1 of 3123
1
1
3