Implementation of the Energy Efficiency in buildings in education sector in the city Sumy
Sumy city
Sumy Region
Energy efficiency
preparation
Estimated cost
6 242 940 EUR
![](/wp-content/uploads/2017/09/3_SUM_038.png)
Brief description:
It is foreseen within the Project to improve energy efficiency of 33 kindergartens aiming to reduce energy resources usage and create comfort conditions for children and stuff.
The following services will be provided: replacement of lighting system, installation of modern energy efficiency equipment, reconstruction of heat supply system, heat pump insulation, replacement of doors and windows, thermal insulation of floor, attic roof, etc.
Beneficiary:
Sumy City Council
Similar Projects
Modernisation of the heating system in the city Kryvyi Rih (I stage) - 1 DNI 001
As per Project Implementation Plan developed 2020 the project includes the following components:
Component 1: Modernisation of more than 7 km district heating networks
Component 2: Boiler Houses:
Decommissioning of the boilers at the Kryvorizhstal BH (KMK) and the district heating mains from KMK
Splitting of heat loads into three zones and hydraulic...
Reconstruction of water supply and sewerage system in the city Mariupol
The overall purpose of water supply and wastewater disposal systems’ modernization in Mariupol is a complex rehabilitation of water supply and sewerage systems of the city in achieving substantial savings of energy, reducing water losses in networks and improve wastewater treatment operations. It is planned that the asset modernization will substantially improve the overall...
Thermal modernization of the public buildings (schools, kindergartens) in the city Ternopil
The Project involves thermal modernization of 52 schools (gross area 184553 m2) and 38 kindergartens (gross area 67653 m2).
It includes the following measures: repair of external insulation, light systems, air ventilation and conditioning systems, and installation of modern equipment.
The aim of the Project to improve comfort level, reduce energy consumption, save energy...
Complex rehabilitation of public lighting system in the city Kyiv
This Project envisages replacement of the existing lamps by new one, as well as replacement of some other elements (cables, teleautomatics) solely, and does not include any elements that will provide new services.
Taking into account, that the street lighting in the city of Kyiv does not have any overabundance (it is installed only in places, where it is needed for the...
Thermomodernization of the public buildings in the city Zaporizhzhia
Thermomodernisation of 14 buildings of public healthcare sector and 46 buildings of public education sector
Activities include:
insulation of exterior walls, replacement of windows and doors, insulation of roofs, insulation cap, insulation ceiling basement, restoration of drainage system, installation of local ventilation systems with heat recovery, reconstruction of the...